Van Nuys
Royal Garden Apartments
84-fixture retrofit across 56 units, 34% water reduction, 1,026,888 gallons saved annually.
Read case study →
Case Study · Water Conservation
A LADWP-funded portfolio retrofit across 18 Los Angeles complexes, 13,668 high-efficiency toilets replaced, 71% less water per flush, 90.8M gallons saved every year. Zero cost to the properties.
Ongoing portfolio rollout · LADWP / MWD High-Efficiency Toilet Rebate
Project Overview
Planet Optima has replaced 13,668 low-efficiency toilets across GHP Property Management’s 18-property Los Angeles portfolio, an ongoing retrofit under the LADWP / MWD High-Efficiency Toilet Rebate program. 3.5 GPF fixtures were swapped for 1.0 GPF WaterSense-certified units, with low-flow showerheads and aerators added throughout. Work continues as new properties come online.
LADWP covered 100% of equipment, installation, and removal at every site. GHP signed one master authorization; Planet Optima handled eligibility, paperwork, scheduling, and rebate processing across the entire portfolio.
See how the LADWP toilet rebate program works →
Project Details

Verified Measurement
Portfolio figures are calculated from the fixture count and flush volumes using Planet Optima’s standard formula (7 flushes per toilet per day), not from a single meter.
Showerhead and aerator retrofits add further savings on top of the toilet figure and are not counted here.
The same water saved each year, put in everyday terms.



Scope of Work
Planet Optima handled every step of the retrofit across all 18 properties, from LADWP application to final rebate processing. GHP approved the master scope and signed one authorization. No plumbing coordination, no tenant letters, no invoices.
More Case Studies
Van Nuys
84-fixture retrofit across 56 units, 34% water reduction, 1,026,888 gallons saved annually.
Read case study →
Sherman Oaks
59-fixture retrofit across 37 units, 32% water reduction, 551,028 gallons saved annually.
Read case study →
Valley Village
46-fixture retrofit across 34 units, 34% water reduction, 438,577 gallons saved annually.
Read case study →Prefer to read this as a PDF? Download our full case study file (10 pages)
LADWP funds the whole toilet replacement for buildings that meet four conditions. After 500,000 fixtures we know exactly what decides it.
“Working with Planet Optima is like a breath of fresh air! Professional and thorough, the team has navigated multiple large scale and complex projects for HDS with ease. Timely communication and a true professional partner. I recommend highly and will be partnering with them again without hesitation!”
“Once I completed the walk with Planet Optima I felt at ease and confident this project would be handled professionally. They did a complete and thorough job, were very attentive to all the residents, and kept their area clean and neat throughout the project.”
“Planet Optima made the entire process seamless. From the initial assessment to the final installation, they handled everything professionally and on schedule. Our tenants experienced minimal disruption, and the savings on our water bill were immediate.”
Send us your building details. We’ll review them and contact you about the programs your property may qualify for.
Fill out the form to the right to check your building’s eligibility.
Tap here to fill out the form and check your building’s eligibility.